| Folie no. |
4415 |
| Dimensions |
14,07x4,48x2,56 |
| Feet |
|
| Built |
1989 |
| Shipyard |
Østerby Smede Og Maskinværksted |
| Port |
|
| Next survey |
|
| BT |
29,1 |
| Comments |
|
| Electricity |
|
| Transmitter |
|
| Receiver |
Sat. tv |
| VHF Radio |
3 x VHF/DSC |
| Echo Sounder |
2 x echo sounder |
| Radar |
2 x radar |
| Nav. Equipment |
2 x Sodena plotter - 2 x sat. compass |
| Autopilot |
Autopilot |
| Scanmar |
|
| AIS monitoring |
AIS |
| Comments |
|
| Main engine |
MTU |
| Year |
1998 |
| Cylinder |
|
| HP |
|
| KW |
214 |
| Engine hours |
68000 |
| Propeller |
Hundested 3-blade in nozzle from summer 2018 |
| Bollard Pull |
Ab. 5,1 ton |
| Gear |
Mekanord 270 from 2002 and total overhauled in 2022 |
| Bow thruster |
|
| Aux. Engine |
|
| Year |
|
| HP |
|
| Fuel |
|
| Lubrication oil |
|
| Fresh water |
|
| Comments |
Engine overhauled in 2019 - total overhauled engine of same type will follow + new double hydr. pump |
| Material |
Steel |
| Construction |
stern trawler |
| Accomodation |
In the front with 4 berths |
| Wheelhouse |
In the front |
| Messroom |
|
| Fish hold |
Isolated fishhold |
| Liferaft |
|
| Comments |
|
| Netdrums |
Double netdrum astern |
| Whinches |
3 drumned wirewinch overhauled in 2023 |
| Fish packing plant |
|
| Guttinmachine |
|
| Icemaker |
|
| Fishing gear |
|
| Comments |
|
No guarantee for specifications